Skip to main content
Stock Expert AI
Earnings Watch INTERMEDIATE ✨ AI Enhanced

Prologis Q3 2026 earnings: revenue $2.39B beats $2.18B estimate

Published 8 min read Data as of (last market close)2 sources
PLD$125.75-0.94%Today, Nov 25, 2026: 64/100

AI-generated editorial content. For informational purposes only. Not financial advice.

PLD — Journal cover

Stock Expert AI data cover: figures from Financial Modeling Prep. Photo credit and licence on the image

Prologis (NYSE: PLD), the world's largest warehouse landlord, reported third-quarter 2026 revenue of $2.39B on Oct. 15, 2026, beating the $2.18B analyst estimate and rising from $2.21B in the third quarter of 2025. Financial data provider FMP lists earnings per share of 1.60 against an estimate of 0.777, but GAAP diluted EPS (the standard accounting measure) was 0.86 versus 0.82 a year earlier. Both the 1.60 and the 0.86 appear below, and the gap between them matters for how you read the "beat."

Key facts

  • Oct. 15, 2026: Prologis reported results for the third quarter ended Sept. 30, 2026. Revenue was $2.39B versus a $2.18B estimate, a $212.0M (9.7%) beat.
  • Per-share earnings: FMP shows EPS of 1.60 versus a 0.777 estimate. GAAP diluted EPS for the quarter was 0.86.
  • Year-ago comparison: Revenue rose 7.8% from $2.21B in the quarter ended Sept. 30, 2025. Net income rose 6.9%, from $764.3M to $817.1M.
  • Oct. 16, 2026: The stock closed at $125.75, down 0.94% on the day. Its 52-week range is $121.17 to $153.35.
  • Next report: Jan. 20, 2027, with analysts expecting EPS of 0.773 and revenue of $2.21B.
MetricQ3 FY2026 (ended Sept. 30, 2026)Year-ago or estimate
Revenue$2.39B$2.21B year-ago; $2.18B estimate
Operating income$936.7M$892.6M year-ago
Net income$817.1M$764.3M year-ago
Diluted EPS (GAAP)0.860.82 year-ago
EPS per FMP1.600.777 estimate
Operating margin39.2%40.3% year-ago

What happened

Prologis owns and develops warehouses and logistics buildings and also manages properties for outside investors. In the quarter ended Sept. 30, 2026, revenue grew 7.8% from a year earlier. Operating income, which is profit before interest and taxes, rose to $936.7M from $892.6M.

About the EPS number. The 1.60 "actual" and the 0.86 GAAP figure are far apart. Real estate companies often highlight a different measure, such as funds from operations, which adds back property depreciation. The FMP estimate of 0.777 may not be measured the same way as the 1.60 actual. So the 105.9% EPS "beat" in the data should be read with caution. The cleaner comparison is revenue, where actual and estimate are measured the same way, and GAAP EPS of 0.86 versus 0.82 a year earlier.

What drove it. According to the earnings call, rents on newly signed and renewed leases came in well above the rents they replaced. Occupancy edged up from the second quarter. Management also said that older leases are still priced below current market rents, which leaves room for future increases as those leases roll over. Prologis also said it bought properties at what it estimates is a discount to the cost of building them new.

CEO Dan Letter said: "Operating fundamentals are healthy, and we remain constructive on the outlook." Managing Director Christopher Caton said: "the replacement cost rents do set up for above inflation growth over time." Replacement cost rent is the rent a new building would need to charge to make building it worthwhile.

Segments. The most recent segment data is for the second quarter ended June 30, 2026. The main Real Estate Operations segment, which collects rent, brought in $2.18B versus $2.04B a year earlier. The Strategic Capital segment, which earns fees from managing money for other investors, brought in $241.6M versus $147.2M.

Guidance. The company narrowed its full-year occupancy range and raised its outlook for development starts and acquisitions. It also lowered its range for property sales and contributions to funds. CFO Timothy Arndt told analysts the cut reflects caution if pricing gets turbulent, and that a couple of deals have slipped into next year. Management gave no next-quarter guidance. The planned SEGRO deal is expected to close in the first half of 2027 and is not expected to be in initial 2027 guidance. More detail is expected in January.

Why it matters for investors

The five-quarter trend. Revenue has risen from $2.21B (quarter ended Sept. 30, 2025) to $2.25B, $2.30B, $2.43B and now $2.39B. The latest quarter is a small step down from the second quarter's $2.43B. Operating margin, the share of revenue left after operating costs, went 40.3%, 37.8%, 36.0%, 39.6% and 39.2%. That is a recovery from the first-quarter low, but still just under the year-ago level.

The data also shows gross margin falling from 45.7% a year ago to 15.5% in the latest quarter. The data does not explain the drop, and operating margin did not fall nearly as much. It is likely a difference in how costs are categorized, so we put more weight on operating margin.

Operating cash flow, the cash the business generates from running its properties, was $1.45B in the quarter ended Sept. 30, 2025, then $1.16B, $1.29B and $1.35B in the following three quarters. Third-quarter 2026 cash flow data was not yet available. Dividends were about $1.00B in the second quarter of 2026, so cash flow covered the payout. The stock's dividend yield is 3.4%.

Balance sheet. As of June 30, 2026, Prologis had $36.44B of total debt, $34.68B of net debt and $53.73B of shareholder equity. Debt-to-equity is 0.68. Arndt said: "Our debt metrics remain in excellent shape, and our liquidity at the end of the quarter was nearly $9 billion." Two third-party scores are less comforting: the Piotroski score, a 0-9 gauge of financial health, is 4, and the Altman Z score, a bankruptcy-risk gauge, is 1.95. Both are modest, though these models are not built for property companies carrying large debt.

Valuation versus peers. On trailing 12-month earnings, PLD trades at a price-to-earnings ratio of 27.70. Peers are CUBE at 26.71, EGP at 34.39, FR at 21.37 and LNSPF at 13.77. PLD's net margin is 45.5%, against 29.4% for CUBE, 40.5% for EGP, 48.0% for FR and 63.6% for LNSPF. Other trailing multiples are price-to-sales of 12.76, EV/EBITDA of 18.04 and price-to-free-cash-flow of 22.80. PLD is far larger than these peers, with a $119.50B market cap.

Analysts. Of the analysts tracked, 26 rate the stock Buy, 15 Hold and 1 Sell, for a consensus of "Buy." Price targets average $154.00 (median $155.00) in a range of $135.00 to $170.00, all above the $125.75 close. Scotiabank upgraded the stock to Sector Outperform on Oct. 13, 2026, and BTIG kept its Buy on Oct. 16, 2026. One outlier: FMP's discounted cash flow model, which estimates value from projected future cash, gives $91.18 per share. That is a model output, not a forecast.

Our MoonshotScore. Stock Expert AI's MoonshotScore V2 for PLD is 63.4, rated Fair. Pillar scores relative to its sector are safety 71, quality 67, growth 64, momentum 48 and valuation 29. In plain terms, the business looks stable and well run, but the stock's price is not cheap against its sector and recent price momentum is soft.

What could go wrong

  • Higher interest rates. Management said the recent rise in Treasury yields will slow deal activity and could pressure property values. Buyers and sellers are further apart on price, and investors are re-checking the exit prices they assume.
  • Development costs. Construction is getting more expensive, financing costs more, and required returns are rising.
  • Data centers. Securing power and permits is getting harder, and regulatory pauses could delay projects. Letter said the large data center pipeline has not been affected so far, but pauses could slow projects by a few months to a couple of quarters.
  • Softer pockets. Some rate-sensitive customer segments are slower, and market rents in Mexico are softening.
  • SEGRO. The deal still needs regulatory clearances.
  • Valuation and insiders. The valuation pillar is the weakest of our five. Form 4 filings (insider trading disclosures) show no open-market insider purchases or sales in the last 90 days.

What to watch next

  • Jan. 20, 2027: the next earnings report, with expected EPS of 0.773 and revenue of $2.21B.
  • Initial 2027 guidance in January, including how management treats SEGRO and how much further rents can rise on older leases.
  • Vacancy. Management said market vacancy has come down from its peak and is on pace to improve a bit further by year-end. Watch whether that turns into stronger rent growth.
  • Interest rates and deal pricing, which management tied to its cautious property-sales outlook.
  • Data center permits and power access for the development pipeline.

Frequently asked questions

Q: Did Prologis beat earnings estimates in the third quarter of 2026?

On revenue, yes: $2.39B versus a $2.18B estimate, reported Oct. 15, 2026. FMP also shows EPS of 1.60 versus 0.777, but GAAP diluted EPS was 0.86, so the two EPS figures are probably measured differently. Revenue and GAAP EPS compared with last year are the safer reads.

Q: How did Prologis's results compare with a year ago?

Revenue rose 7.8% to $2.39B from $2.21B in the quarter ended Sept. 30, 2025. Net income rose 6.9% to $817.1M from $764.3M. Diluted EPS was 0.86 versus 0.82.

Q: What did Prologis say about the rest of 2026?

According to its call, the company narrowed its occupancy range, raised its development-starts and acquisitions outlook, and lowered its property sales and contributions range, citing caution about pricing. It gave no next-quarter guidance. It expects the SEGRO deal to close in the first half of 2027 and not to be included in initial 2027 guidance.

This is educational content, not investment advice. Past performance does not guarantee future results.

What to watch next

  1. The next earnings report, with expected EPS of 0.773 and revenue of $2.21B.

PLD on Stock Expert AI

MoonshotScore 64/100 Nov 25, 2026

A 0-100 score built from five sections.

  • Quality67
  • Safety63
  • Valuation45
  • Growth52
  • Momentum46
🎯

MoonshotScore AI Ratings

Each stock is scored 0-100 on five pillars: Business Quality, Financial Safety, Valuation, Growth Durability and Momentum. A story quotes the score of the day it was written.

PLD Today, Nov 25, 2026: 64/100When published, Oct 17, 2026: 63/100

Related Tickers

PLD
prologispldearningsreitsindustrial-real-estate

Sources

Related Sectors & Industries

Next story

Tech Pulse We posted ten job openings, and only AI agents can apply 4 min read
👁 Editorial Transparency
🧠Content generated by AI editorial engine
👤Stock Expert AI Research is an AI editorial voice of Stock Expert AI
✅Written by Stock Expert AI's research desk with AI assistance. Figures come from FMP data and the official sources cited in the article.
🛡Financial Modeling Prep (FMP)
🕑Last updated:

Get the week's earnings in one Thursday email

The S&P 500 companies on that week's earnings calendar, each with its current MoonshotScore, plus the week's Journal research. Free, one email a week, with an unsubscribe link in every issue.

We send one confirmation email first and nothing else until you click its link (it works for 7 days). After that, the Weekly only. Your address is not sold or shared. Newsletter details · Free guide: How to read a MoonshotScore · Privacy Policy


Explore More Market Intelligence

Evidence & Sources

  • Figures come from Financial Modeling Prep (FMP). SEC EDGAR is used only for filing links and company identity details (legal name, address), never for figures.
  • MoonshotScore V2 rates eligible US-listed companies from 0 to 100 against their sector peers on five pillars: Business Quality (weight 26), Financial Safety (weight 20), Valuation (weight 18), Growth Durability (weight 16) and Momentum (weight 12). Weights are rescaled to 100 when all five pillars have data: 28.3%, 21.7%, 19.6%, 17.4% and 13.0% of the score. It reads no news-sentiment or analyst data, and it is not a probability of future returns.
  • Definitions follow standard investing terminology, with key terms explained inline in plain language where useful.
  • Each price is the last quote we recorded, shown with the trading session it belongs to. Pages are served from a cache, so the copy you are reading can lag that quote. Each quote is a provider snapshot, not an exchange feed.
  • This page is educational and does not constitute investment advice.
  • Numbers come from market data providers (FMP); AI writes the plain-English explanations around them, which should be verified with independent research.