Gaztransport & Technigaz S.A. (GZPZF) Stock Price & Analysis
Gaztransport & Technigaz S.A. (GZPZF) — price $234.60 (-3.05%), as of the Oct 5, 2026 trading session; market cap $8.70B. Expected results Feb 24, 2027.
Educational signal · not a buy or sell recommendation · How to read this
Gaztransport & Technigaz S.A. · GZPZF · Energy · Oil & Gas Equipment & Services
Research dated 2026-09-13: Gaztransport & Technigaz supplies cryogenic membrane containment systems and related engineering for ships and storage infrastructure handling liquefied gases; it sells neither the vessels nor the gas itself. The key question is whether demand for its containment technology and support services can preserve the unusually rich economics shown by its latest margin profile.
Price as of Oct 5, 2026
Key Statistics
MoonshotScore is not published for this security.
Price & valuation
| Measure | Value | As of |
|---|---|---|
| Latest provided price | $234.60 | |
| Change on the day | -3.05% | |
| 52-week range | $147.38 – $246.86 | |
| Market capitalisation | $8.70B | |
| Price / earnings (trailing) | 17.53 | |
| Shares traded on the day | 1 | |
| Beta (volatility vs the S&P 500) | 0.45 | |
| Dividends per share (last 12 months) | $10.32 | |
| Dividend yield (last 12 months) | 4.27% |
Price & events
Triangles mark reported quarters on the line: pointing up is above the recorded estimate, down is below, a diamond means no estimate on file or a dated event that is not a results report. Numbers key to the dated list. Point at or tab to any week for its close.
Events behind the price
- · Earnings results · above the recorded estimate
- · Earnings results · below the recorded estimate
- · Earnings call · management outlook
Results dates follow the earnings feed; call dates follow the transcript provider. Nearby dates do not establish that an event caused a price move.
Upcoming events
Management outlook
We are, of course, confirming our guidance for the year 2026. As a reminder, we expect revenue to be in the range of EUR 740 million to EUR 780 million, where EBITDA will be in between EUR 490 million and EUR 530 million.
Francois Michel · Statement from
The 84 million tons per annum of new liquefaction capacity decided last year, the 37 million tons decided this year, the 29 additional of pre-FID projects that we expect will drive the need for new vessels to transport new volumes that will come online for the -- in the next couple of years.
Francois Michel · Statement from
Chronological order, not a duration scale. Statement dates identify the earnings call, not a deadline. Management expectations and provider estimates can change.
Read management statementsOther perspectives
Council score for Gaztransport & Technigaz (GZPZF): perspectives
Council is a separate blend of available disciplines; MoonshotScore above remains the five-pillar research rating.
Legends Council
5 lenses, 5 current
AI simulations built from the named investors' published principles. Not affiliated with, endorsed by, or the opinion of these individuals. How these lenses are built
Read on: Oct 6, 2026
Munger's Mindset
Balance Sheet & Valuation · historical
Read on: Sep 9, 2026 · older than the 27 hours refresh window; not a current reading
How to read these bars and different assessments
Council is a separate blend of available disciplines; MoonshotScore above remains the five-pillar research rating.
Bars show each model's ordered assessment on its own scale, not a probability or a comparable investment return. The adjacent words give the assessment; more filled segments indicate a stronger model reading.
On Sep 9, 2026, the Munger lens read the price at that time as fairly valued against its own estimate of value.
Readings on this page are from Oct 6, 2026, except a card that shows its own read date.
Watch the GZPZF film — every key number, told as a short cinematic story
~2 min · open the film
What is Gaztransport & Technigaz (GZPZF), and what does it report?
Short answer · as of
The company serves shipyards, shipowners, gas companies and terminal operators with membrane systems used in carriers, floating facilities, onshore tanks and vessels fuelled by liquefied natural gas.
Research dated 2026-09-13.
The company serves shipyards, shipowners, gas companies and terminal operators with membrane systems used in carriers, floating facilities, onshore tanks and vessels fuelled by liquefied natural gas. Revenue therefore reflects the adoption and delivery of GTT technology within customer projects, supplemented by engineering studies, operational support, maintenance and vessel-performance tools.
Reporting divides the business between Core Business and Hydrogen. Core Business spans containment and associated maritime services, while Hydrogen designs and assembles electrolysers for green-hydrogen production.
What do the latest results show for Gaztransport & Technigaz (GZPZF)?
Short answer · as of
The most recent reported quarter, Q2 FY2026, carried revenue of $434M.
Research dated 2026-09-13.
The latest ratio set depicts a high-margin business: gross profitability leaves relatively little revenue absorbed by direct costs, while operating and net margins remain exceptionally strong. Returns on assets and equity are also elevated, consistent with substantial economic value being captured through engineering and containment technology rather than vessel construction.
Demand still originates in capital projects. More LNG carriers, floating gas facilities, storage tanks or gas-fuelled vessels adopting GTT systems should expand the installed base available for engineering and support work; weaker project activity or reduced adoption would work in reverse. Electrolyser sales provide a separate route to growth, but they expose the Hydrogen segment to a different customer and execution cycle.
Did results meet expectations?
Reported earnings and revenue alongside the estimates recorded by the provider.
- Latest report · revenue
- $442.32M Jul 28, 2026
- Latest report · revenue estimate
- $437.74M Jul 28, 2026
- Latest report · revenue vs estimate
- Above estimate Jul 28, 2026
- Latest report · EPS vs estimate
- Below estimate Jul 28, 2026
| Report date | Revenue · reported | Revenue · estimate | EPS · reported | EPS · estimate |
|---|---|---|---|---|
| Jul 28, 2026 | $442.32M | $437.74M | $6.4900 | $6.5300 |
| Feb 19, 2026 | $490.83M | $494.54M | $7.4800 | $6.9900 |
| Jul 29, 2025 | $457.66M | $199.10M | $5.7000 | Not available |
| Jul 25, 2024 | $316.96M | $318.12M | $4.9300 | Not available |
Dates are report dates, not fiscal period ends. Revenue is in USD; EPS is USD per share, rounded to four decimals. The earnings feed does not establish a basic, diluted or adjusted basis. Earnings-feed EPS may differ from statement EPS; the two series are not combined.
Quarterly income statement — 4 quarters
| Period | Revenue | Net income | EPS |
|---|---|---|---|
| Q2 FY2026 | $434M | $236M | $6.34 (diluted) |
| Q4 FY2025 | $465M | $262M | $7.05 (diluted) |
| Q2 FY2025 | $436M | $202M | $5.44 (diluted) |
| Q4 FY2024 | $389M | $199M | $5.36 (diluted) |
What are the financial strengths and risks for Gaztransport & Technigaz (GZPZF)?
Short answer
The distress and quality screens read Altman Z 15.41 · Piotroski F 5.
Research dated 2026-09-13.
Current and quick liquidity ratios indicate sound near-term coverage, while leverage is modest relative to equity. That combination provides financial resilience alongside the company’s strong reported profitability.
The larger vulnerability is commercial concentration around liquefied-gas infrastructure. Shipyard awards and customer adoption can move unevenly with major maritime and storage projects, while pressure on membrane-system economics would reach the company’s unusually high margins directly. Hydrogen adds diversification, but also brings assembly and project-execution risk beyond the established containment franchise.
What should you watch next at Gaztransport & Technigaz (GZPZF)?
Short answer · as of
The next earnings report is expected on Feb 24, 2027.
Research dated 2026-09-13.
Watch whether shipyards continue selecting GTT membranes for LNG carriers, floating facilities, storage projects and gas-fuelled vessels. The most useful confirmation would be continued system adoption accompanied by stable operating margins, showing that project demand is translating into retained economics rather than merely broader activity.
Service depth matters after installation. Greater use of operational support, repairs, consultancy and vessel-performance software would broaden customer relationships around the installed containment base. In Hydrogen, evidence should come from sustained electrolyser demand without dilution of the group’s profitability or liquidity profile.
What management is planning
Management expectations, not completed milestones or guarantees. Selected verbatim excerpts; dates follow the transcript provider.
We are, of course, confirming our guidance for the year 2026. As a reminder, we expect revenue to be in the range of EUR 740 million to EUR 780 million, where EBITDA will be in between EUR 490 million and EUR 530 million.
Francois Michel ·
The 84 million tons per annum of new liquefaction capacity decided last year, the 37 million tons decided this year, the 29 additional of pre-FID projects that we expect will drive the need for new vessels to transport new volumes that will come online for the -- in the next couple of years.
Francois Michel ·
Regarding the cash position and the impact of new orders, definitely, regarding the level of new orders that we receive this year and in the coming years, we expect to increase this cash position and to receive cash in advance because we have a model to recognize revenue after receiving the cash. It means that we are going to improve our working capital first and our cash position at the end, definitely regarding the level of orders that we expect in the coming years.
Thierry Hochoa ·
What the records here don't tell us
- Detailed statement figures are not shown because their conversion to USD has not been verified.
- No insider Form 4 transaction falls inside the window this page reads.
Checked against the records this page reads, on the dates shown above.
How is Gaztransport & Technigaz scored?
Research dated 2026-09-13.
GTT differs from shipbuilders and conventional oilfield-equipment suppliers because its product is the cryogenic containment layer inside maritime and storage assets, plus the engineering and operating support surrounding that layer. Customers undertake the heavy infrastructure project; GTT participates where liquefied gas must be contained safely and efficiently.
That positioning links the company to LNG shipping and storage investment without making it a vessel owner, gas producer or terminal operator. Its reach across carriers, floating facilities, onshore tanks, alternative liquefied gases, performance software and hydrogen electrolysers also gives it a broader technology perimeter than a pure marine-equipment manufacturer.
| Company | Price | Market value | Score |
|---|---|---|---|
| $0.97 Oct 5, 2026 | $8.38B | — Model unavailable | |
| $34.35 Oct 5, 2026 | $10.2B | — Model unavailable | |
| $9.88 Oct 2, 2026 | $11.8B | — Model unavailable | |
| $36.48 Oct 2, 2026 | $15.8B | — Model unavailable | |
| $0.95 Oct 5, 2026 | $8.21B | — Model unavailable | |
| $19.51 Oct 5, 2026 | $7.04B | — 5-pillar · not comparable | |
| $83.58 Oct 5, 2026 | $6.46B | — 5-pillar · not comparable | |
| $82.32 Oct 5, 2026 | $5.91B | — 5-pillar · not comparable | |
| $83.49 Oct 5, 2026 | $5.78B | — 5-pillar · not comparable | |
| $53.56 Oct 5, 2026 | $5.41B | — 5-pillar · not comparable | |
| $30.10 Oct 5, 2026 | $5.28B | — 5-pillar · not comparable | |
| $74.75 Oct 5, 2026 | $4.58B | — 5-pillar · not comparable |
The comparison model is unavailable. Other models are not directly comparable. Price and score dates are shown separately; market-value dates are unavailable.
Gaztransport & Technigaz Energy Stock: Key Questions Answered
Research dated 2026-09-13; the answers below are from that research, and the full attribution is under Sources. The last 2 questions are answered from this page's own dated data, not from the research.
What does GTT sell to LNG shipyards?
GTT provides cryogenic membrane containment systems and related engineering used inside LNG carriers and other liquefied-gas vessels. Shipyards build the vessel, while GTT supplies the containment technology and supporting expertise.
How does GTT earn from vessels after membrane installation?
The company offers operational support, maintenance, repairs, engineering studies and vessel-performance tools around its membrane systems. These activities extend the customer relationship beyond the original containment project.
What sits inside GTT’s Hydrogen segment?
The Hydrogen segment designs and assembles electrolysers that use renewable energy to produce green hydrogen. It is distinct from the established cryogenic-containment activities in Core Business.
What is the GZPZF quotation?
GZPZF is the OTC Markets quotation for France-based Gaztransport & Technigaz. The underlying company is headquartered in Saint-Rémy-lès-Chevreuse.
What is the GZPZF stock price today?
The last price recorded on this page for Gaztransport & Technigaz S.A. (GZPZF) is $234.60, as of the Oct 5, 2026 trading session (source: Financial Modeling Prep (FMP) · quote). It is a provider snapshot, not a live exchange feed, so check a brokerage quote before you trade.
Does GZPZF pay a dividend?
Yes. Gaztransport & Technigaz S.A. (GZPZF) shows a trailing 12-month dividend yield of 4.27%, as of Oct 2, 2026, in the data on this page. Payout ratio and cash-flow coverage decide whether it can last, and past dividends do not guarantee future payments.
Disclaimer: This content is for informational purposes only and does not constitute investment advice. Always do your own research and consult a financial advisor.
Research written by Codex (gpt-5.6-sol) on 2026-09-13. AI-authored analysis; source dates are shown with each answer. Editorial oversight is systemic, not page-by-page. Editorially accountable: Sedat ANAK, Founder and Editor-in-Chief.
Sources — records for every figure on this page (36 figures)
The 36 rows below are exactly the facts the evidence-backed sections of this page printed — the 10-second verdict, the MoonshotScore, price and market value, the five questions with their receipts, and the records behind this page. Known dates and sources are recorded on their own rows; an em dash or UNRECORDED tier preserves a stored observation without inventing either. The quarterly income statement is provider-standardized (FMP) under one row, and scale definitions — a 0-100 rating, the band ladder, the Piotroski 0–9 range — are fixed rather than measured. No number in those sections was generated by a model. The register does not cover quoted third-party headlines, the dated council readings, or the Frequently Asked Questions; each of those says where it came from where it stands.
"As of" is the date the value is true for where the source carries one — a quarter end, a filing date, a price close, the day the score was computed. A cached observation with no source date remains undated; the page publication date is not used as a substitute.
OFFICIAL — 1 fact from SEC filings and earnings calls
| Fact ID | Fact | Value as shown | As of | Tier | Source |
|---|---|---|---|---|---|
prod.outlook | Management outlook — call excerpts | Francois Michel (Jul 29, 2026): We are, of course, confirming our guidance for the year 2026. As a reminder, we expect revenue to be in the range of EUR 740 million to EUR 780 million, where EBITDA will be in between EUR 490 million and EUR 530 million. Francois Michel (Jul 29, 2026): The 84 million tons per annum of new liquefaction capacity decided last year, the 37 million tons decided this year, the 29 additional of pre-FID projects that we expect will drive the need for new vessels to transport new volumes that will come online for the -- in the next couple of years. Thierry Hochoa (Jul 29, 2026): Regarding the cash position and the impact of new orders, definitely, regarding the level of new orders that we receive this year and in the coming years, we expect to increase this cash position and to receive cash in advance because we have a model to recognize revenue after receiving the cash. It means that we are going to improve our working capital first and our cash position at the end, definitely regarding the level of orders that we expect in the coming years. | OFFICIAL | Company earnings call, transcript via Financial Modeling Prep (FMP) — Selected verbatim statements from the latest available call, dated by the transcript provider. Management expectations, not completed milestones or guarantees. Relative dates retain the speaker's wording. |
FMP — 27 facts from Financial Modeling Prep endpoint families
| Fact ID | Fact | Value as shown | As of | Tier | Source |
|---|---|---|---|---|---|
px.last | Latest provided price | $234.60 | FMP | Financial Modeling Prep (FMP) · quote — Dated to the US trading session the price belongs to, derived from the quote record's timestamp (weekend and pre-open reads roll back to the previous weekday; exchange holidays are not modelled). The record does not establish an exchange execution time. Retrieved 2026-10-05T21:44:26.866Z. | |
px.change | Change on the day | -3.05% | FMP | Financial Modeling Prep (FMP) · quote | |
px.mcap | Market capitalisation | $8.70B | FMP | Financial Modeling Prep (FMP) · quote — Date unknown Market cap record date: 2026-10-02. FMP quote timestamp: 2026-10-02T20:00:00.000Z. Captured from FMP at 2026-10-05T21:44:25.903Z. No share-count basis is inferred; this page preserves the reported amount instead of recalculating it from shares. | |
earn.next | Next earnings date | Feb 24, 2027 | FMP | Financial Modeling Prep (FMP) earnings calendar — The date is our provider's estimate until the company confirms it. | |
px.change_abs | Change on the day, in dollars | −$7.39 | FMP | Financial Modeling Prep (FMP) · quote | |
px.pe | Price / earnings (trailing) | 17.53 | FMP | Financial Modeling Prep (FMP) · quote | |
px.volume | Shares traded on the day | 1 | FMP | Financial Modeling Prep (FMP) · quote | |
px.beta | Beta | 0.45 | FMP | Financial Modeling Prep (FMP) company profile | |
id.ceo | Chief executive | Francois Michel | FMP | Financial Modeling Prep (FMP) key executives (proxy-derived) — Titles and pay come from the company's proxy statement as our provider parsed it. | |
id.employees | Employees | 862 | FMP | Financial Modeling Prep (FMP) company profile | |
id.hq | Headquarters | 1, route de Versailles, Saint-Remy-les-Chevreuse, IF, 78470, FR | FMP | Financial Modeling Prep (FMP) company profile | |
fin.q_revenue | Revenue, Q2 FY2026 | $434M | FMP | Financial Modeling Prep (FMP) · income statement (quarterly) | |
earn.history.depth.2026-07-28.revenue_actual | Revenue · reported — report date 2026-07-28 | $442.32M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2026-07-28.revenue_estimated | Revenue · estimate — report date 2026-07-28 | $437.74M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2026-07-28.eps_actual | EPS · reported — report date 2026-07-28 | $6.4900 | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2026-07-28.eps_estimated | EPS · estimate — report date 2026-07-28 | $6.5300 | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2026-02-19.revenue_actual | Revenue · reported — report date 2026-02-19 | $490.83M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2026-02-19.revenue_estimated | Revenue · estimate — report date 2026-02-19 | $494.54M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2026-02-19.eps_actual | EPS · reported — report date 2026-02-19 | $7.4800 | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2026-02-19.eps_estimated | EPS · estimate — report date 2026-02-19 | $6.9900 | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2025-07-29.revenue_actual | Revenue · reported — report date 2025-07-29 | $457.66M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2025-07-29.revenue_estimated | Revenue · estimate — report date 2025-07-29 | $199.10M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2025-07-29.eps_actual | EPS · reported — report date 2025-07-29 | $5.7000 | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2024-07-25.revenue_actual | Revenue · reported — report date 2024-07-25 | $316.96M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2024-07-25.revenue_estimated | Revenue · estimate — report date 2024-07-25 | $318.12M | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
earn.history.depth.2024-07-25.eps_actual | EPS · reported — report date 2024-07-25 | $4.9300 | Report date · | FMP | Financial Modeling Prep (FMP) earnings — Earnings-history note |
fin.q_table | Quarterly income statement | 4 quarters through Q2 FY2026 | FMP | Financial Modeling Prep (FMP) · income statement (quarterly), as filed |
UNRECORDED — 3 facts from stored observations whose source was not recorded
| Fact ID | Fact | Value as shown | As of | Tier | Source |
|---|---|---|---|---|---|
px.range52 | 52-week range | $147.38 – $246.86 | UNRECORDED | Stored company-profile observation — Captured 2026-10-03 | |
earn.history | Reported versus estimated, recent quarters | EPS beat 2 of 3 | UNRECORDED | Stored earnings-history observation — Captured 2026-10-03 · Expired observation | |
fin.scores | Distress and quality screens | Altman Z 15.41 · Piotroski F 5 | UNRECORDED | Stored financial-scores observation — Captured 2026-10-05 |
COMPUTED — 4 facts from our arithmetic, formula restated
| Fact ID | Fact | Value as shown | As of | Tier | Source |
|---|---|---|---|---|---|
div.ttm_per_share | Dividends per share, last 12 months (split-adjusted) | $10.32 | COMPUTED | Financial Modeling Prep (FMP) split-adjusted dividend history — Sum of 2 split-adjusted declared dividends with an ex-date in the 365 days to 2026-10-05, per current share. Ex-dates are not payment dates; special dividends are included. Not a declared annual rate. | |
div.ttm_yield | Dividend yield, last 12 months | 4.27% | COMPUTED | Financial Modeling Prep (FMP) split-adjusted dividend history and quote — Split-adjusted dividends with ex-dates in the trailing 365-day window divided by the packet price, on the same current-share basis. Price date follows the quote, latest price bar or packet-build day when unstamped. Not a forecast or declared annual rate. | |
earn.history.depth.2026-07-28.revenue_actual.comparison | Latest report · revenue vs estimate | Above estimate | Report date · | COMPUTED | Computed from Financial Modeling Prep (FMP) earnings — Earnings-history note — Method: compare reported revenue ($442.32M) with the recorded estimate ($437.74M) at displayed precision. Equal displayed values are in line. This compares reported results with recorded estimates, not investment returns. |
earn.history.depth.2026-07-28.eps_actual.comparison | Latest report · EPS vs estimate | Below estimate | Report date · | COMPUTED | Computed from Financial Modeling Prep (FMP) earnings — Earnings-history note — Method: compare reported EPS ($6.4900) with the recorded estimate ($6.5300) at displayed precision. Equal displayed values are in line. This compares reported results with recorded estimates, not investment returns. |
OURS — 1 fact from Stock Expert AI's own score and rank
| Fact ID | Fact | Value as shown | As of | Tier | Source |
|---|---|---|---|---|---|
gap.statement_currency | Statement currency limitation | Detailed statement figures are not shown because their conversion to USD has not been verified. | OURS | Stock Expert AI currency-basis check |
Fact-family notes
- Earnings-history note. Source series as of 2026-07-28. Dates are report dates, not fiscal period ends. Revenue is in USD; EPS is USD per share, rounded to four decimals. The earnings feed does not establish a basic, diluted or adjusted basis. Earnings-feed EPS may differ from statement EPS; the two series are not combined. Applies to Fact IDs:
earn.history.depth.2026-07-28.revenue_actual,earn.history.depth.2026-07-28.revenue_estimated,earn.history.depth.2026-07-28.revenue_actual.comparison,earn.history.depth.2026-07-28.eps_actual.comparison,earn.history.depth.2026-07-28.eps_actual,earn.history.depth.2026-07-28.eps_estimated,earn.history.depth.2026-02-19.revenue_actual,earn.history.depth.2026-02-19.revenue_estimated,earn.history.depth.2026-02-19.eps_actual,earn.history.depth.2026-02-19.eps_estimated,earn.history.depth.2025-07-29.revenue_actual,earn.history.depth.2025-07-29.revenue_estimated,earn.history.depth.2025-07-29.eps_actual,earn.history.depth.2024-07-25.revenue_actual,earn.history.depth.2024-07-25.revenue_estimated,earn.history.depth.2024-07-25.eps_actual.
- Published
- Research standards
- Methodology · Editorial policy · Corrections
- Report a number
- sedat@stockexpertai.com
Sources used for research written 2026-09-13
Historical evidence preserved with this analysis. Current figures are listed separately above.
| Evidence | Captured value | Source date | Source type | Source |
|---|---|---|---|---|
| Legal name | Gaztransport & Technigaz SA | 2026-09-13 | FMP | Financial Modeling Prep (FMP) company profile |
| Ticker / exchange | GZPZF on OTC Markets OTCPK | 2026-09-13 | FMP | Financial Modeling Prep (FMP) company profile |
| Sector / industry (provider taxonomy) | Energy / Oil & Gas Equipment & Services | 2026-09-13 | FMP | Financial Modeling Prep (FMP) company profile |
| Business description | Gaztransport & Technigaz SA, a technology and engineering company, provides cryogenic membrane containment systems for the maritime transportation and storage of liquefied gases in South Korea, China, and internationally. It operates through the Core Business and Hydrogen segments. The. company offers onshore membrane storage tank solutions for the storage of LNG (Liquefied Natural Gas); LNG floating storage solution; solutions for the transportation and storage of other liquefied gases such as ethane, ethylene, propane, butane, and propylene; solutions for the offshore LNG industry, including floating storage and regasification units (FSRUs), floating storage and unloading units (FLNGs), and floating storage units (FSUs); and consultancy services, engineering studies, operational support, and maintenance and repairs of GTT membrane systems. It also sells decision-making support tools for ship-owners and operators, including data analysis and vessel performance optimization; designs and assembles electrolysers to produce green hydrogen from renewable energy; and adapts containment technology for LNG-fuelled vessels. It serves ship-owners, gas companies, terminal operators, and shipyards. Gaztransport & Technigaz SA was founded in 1963 and is headquartered in Saint-Rémy-lès-Chevreuse, France. | 2026-09-13 | FMP | Financial Modeling Prep (FMP) company profile |
| Trailing twelve-month ratio set | Quick ratio: 1.87; Current ratio: 1.95; Debt to equity: 0.17; Net margin: 55.4%; Gross margin: 96.8%; Operating margin: 64.1%; Return on assets: 36.5%; Return on equity: 79.6% Price-based multiples captured at research time are not repeated here; the page shows each once, from current figures with their own dates. A ratio our provider could not compute is absent rather than shown as zero. | 2026-09-13 | FMP | Financial Modeling Prep (FMP) key-metrics-ttm + ratios-ttm |
| Headquarters | 1, route de Versailles, Saint-Rémy-lès-Chevreuse, 78470, France | 2026-09-13 | FMP | Financial Modeling Prep (FMP) company profile |
Data provided for informational purposes only.